average office, given at least 18 hours a day to execute, the Full audit is expected to take four weeks to complete.
The audits check to ensure at least 20 percent of space in /rclog directory is available; if not, it stops running.
The Incremental audit reads the log files that were backed up via the
ODD:BKUP
command to get the tuples that
need to be audited. If the
ODD:BKUP
was not done for several days, depending on the amount of
customer-originated recent changes (CORCs) that were done in that office, the log files could be large. In this case,
the Incremental audit may run for a long time. If another ODD:BKUP is done at this moment, the Incremental audit is
stopped without completing all the log entries. The remaining log entries in this log file may or may not be audited by
the next session of the Incremental audit.
NOTE:
These will be picked up as regular tuples by the Full audit, if the Full audit is running.
5.14.15 DOCUMENTATION/TRAINING
Even though several 5ESS-2000 switch documents have information on the Automated SODD Audit, the two
primary documents where the majority of information is provided are this document, the 235-040-100 -
OA & M
Planning Guide
, and the 235-600-10X -
Translations Data
manual (TDM) will provide the Population Rule listings.
Lucent Technologies Training offers the following courses that provide information on SODD:
ES5D9D - OA&M Enhancements Video.
ES5D9H - Analyzing Database Troubles (PRL5) using SODD.
5.14.16 RETROFITS
The Automated SODD Audit is an OA&M Enhancement, and although it has no direct impact on the switch retrofit, it
does have an indirect impact. Before a retrofit can take place, the switch data must be clean (especially for those
relations that are critical to the success of the retrofit). The SODD Audit is a key element in cleaning up that data; it
should be run and its errors analyzed and corrected so that the retrofit can occur without incident. Therefore, it is
crucial to the success of the retrofit that the switch customer exercises the SODD Audit and makes any corrections
to the ODD that are necessary.
The appropriate
Software Release Retrofit Procedures
manual can be referenced for additional information on the
Automated SODD Audit's role prior to a switch retrofit.
5.15 ON-SWITCH ECD AUDIT
5.15.1 FEATURE DEFINITION
The On-Switch ECD Audit will allow switch owners to verify the integrity of their ECD data base. The audit is invoked
either via an input message or a scheduling mechanism. Lucent Technologies recommends that the audit be run
regularly as part of routine switch maintenance in order to identify and correct any ECD data base errors as they
may occur. The audit will be required to be run prior to the final data base dump for a retrofit and the ECD data base
must be error free. Each audit execution produces a summary message and a detailed log of individual error
conditions.
5.15.2 KEY AUDIT EVENTS
Refer to the 235-600-700/750,
Input/Output Messages Manuals
for complete descriptions of the input and output
messages used in this document.
235-105-210
October 1999
Copyright © 1999
Page 59
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...