SECTION 2
EQUIPMENT TEST LIST:
This section lists preventive (routine) maintenance schedules for the
5ESS
®
-2000 switch. Preventive maintenance is performed on a specified schedule to ensure continuing peak
overall performance of the network.
SECTION 3
SYSTEM CONTROL OPERATIONS DESCRIPTION:
Describes system control functions, for
example, off-line boot verification, Automatic Trunk Test Scheduler, Authority Management, and Call
Monitoring.
SECTION 4
SYSTEM CONTROL OPERATIONS PROCEDURES:
This section contains detailed level
procedures for performing the system control functions.
SECTION 5
MEMORY ALTERATION DESCRIPTION:
This section contains a description of the changes
possible within the
5ESS
®
-2000 switch data base. Covered within this section are software release update,
office backup methods, office dependent data (ODD) backup, ODD recovery, editing the data base using the
office data base editor (ODBE), software release retrofit, and software-update procedure automation.
SECTION 6
MEMORY ALTERATION PROCEDURES:
This section contains detailed level procedures for
the subjects described in Section 5 of this manual and supports off-line boot verification.
SECTION 7
REMOTE OFFICE TEST LINE:
This section describes the functions and equipment of the
remote office test line (ROTL) for the
5ESS
®
-2000 switch.
SECTION 8
FAN AND ALARM TESTS:
This section contains detailed level procedures for fan and alarm
tests. This section also contains procedures to change fan unit air filters.
SECTION 9
MOVING HEAD DISK PROCEDURE DESCRIPTION:
This section contains descriptions for
converting, connecting, or replacing moving head disks (MHD).
SECTION 10
MOVING HEAD DISK PROCEDURES:
This section contains detailed level procedures for the
subjects described in Section 9 of this manual.
NOTE:
Refer to 235-105-220 for Call Trace Procedures. These procedures are not covered in 235-105-210 .
SECTION 11
MISCELLANEOUS ROUTINE PROCEDURES:
This section contains procedures to record
announcements using the 13A recorded announcement unit, conversion of a RISLU to an ERISLU, and to
update numerous IDCU procedures.
SECTION 12
ROUTINE EXERCISE DESCRIPTION:
This section provides a description of the
5ESS
®
-2000
switch routine exercise (REX), including the administration module (AM).
SECTION 13
ROUTINE EXERCISE PROCEDURES:
This section contains detailed level procedures for the
subjects described in Section 12 of this manual.
SECTION 14
FEATURE ACTIVATION PROCEDURES:
The section contains the procedures that activate or
turn-on various exchange features. This could be a complete growth of a feature or just the changing or
updating of one or more attributes for a specific feature. This section also covers the removal from service or
de-activation (de-growth) of a feature.
SECTION 15
OPERATIONS SUPPORT SYSTEMS ACTIVATION:
This section contains detailed level
procedures to bring up the
5ESS
®
-2000 switch operations support systems (OSS).
GLOSSARY:
This section provides brief definitions of acronyms and abbreviations used in this manual.
INDEX:
Lists the subjects covered in this manual.
APPENDIX:
Contains the operations and maintenance checklist.
235-105-210
October 1999
Copyright © 1999
Page 2
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...