4.
Using the selected work order form as a guide, type and enter the indicated values for each KEY attribute.
Response:
System completes remainder of view.
Enter Delete, Change, Validate, Screen #, or Print:
5.
Verify data.
6.
Type and enter
D
Response:
deleting ....FORM DELETED
REMOTE TERMINAL VIEW
page displayed with attributes blank.
7.
Type and enter
<
Response:
18.0 SM AND REMOTE TERMINALS VIEWS
page displayed.
11.15.8 Delete Unused IFACs from Data Base
1.
At the RC/V terminal, type and enter
20.23
Response:
Enter Data Base Operation
I=Insert, R=Review, U=Update, D=Delete:
2.
If all IFACs on a loop-side interface (LSI) are to be deleted, then continue this procedure at Step 4.
Otherwise, continue this procedure at Step 9.
3.
Type and enter
D
Response:
FACILITY EQUIPMENT (IFAC)
page displayed. Cursor at SM attribute.
4.
Select the completed work order Form 20.23 indicating what LSI is having all of its IFACs deleted. This form
should have the KEY attributes listed in the following display:
1. SM ___ INPUT APPROPRIATE DATA
2. IDCU ___
3. LSI ___
5.
Using the selected work order form as a guide, type and enter the indicated values for each KEY attribute.
Response:
System completes remainder of view.
Enter Delete, Change, Validate, Screen #, or Print:
6.
Verify data.
7.
Type and enter
D
Response:
deleting ....FORM DELETED
FACILITY EQUIPMENT (IFAC)
page displayed with KEY attributes blank.
235-105-210
October 1999
Copyright © 1999
Page 4
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...