2.
Disengage the side 0 MCTU fuse, as pictured in bezel diagram, by twisting the fuse to the left and pulling the
fuse.
11.38.7 Disengage Side 0 Pin Protectors from the Backplane
1.
Disengage the side 0 plastic pin protectors from the backplane according to the following EQL:
EQL
TERM
119-156
006
119-156
106
11.38.8 Install the 127C Apparatus Mounting Retainer for Side 0, if Necessary
1.
If not already present, install the 127C retainer to the following EQL:
EQL
TERM
119-156
1B0
NOTE:
See manufacturer note 38 and Table 8A for 127C installation instructions.
11.38.9 Connect Side 0 ETR Cable Connector to the DLI
1.
Obtain the side 0 cable ED and group numbers from J-Drawing J-5D003LA-1 (See engineering note #66).
2.
Connect the ETR cable to the following EQL:
EQL
TERM
119-156
100
3.
Verify that the other end of the external reference cable is properly connected to the external timing source
(that is, Tip vs. Ring pairs).
11.38.10 Install the Side 0 963E-2 Shorting Connector
1.
Install the side 0 963E-2 shorting connector to the following EQL:
EQL
TERM
119-156
112
NOTE:
See manufacturer note 21 for 963E-2 installation instructions.
11.38.11 Reseat Side 0 MCTU Fuse
1.
Reseat the side 0 MCTU fuse and twist the fuse to the right according to the following EQL:
EQL
119-156
11.38.12 Reseat DLI Side 0 Pack
1.
Reseat and engage the DLI side 0 pack (TN1077) into the SM frame.
235-105-210
October 1999
Copyright © 1999
Page 3
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...