fuse.
11.39.23 Disengage Side 1 Shorting Connector 963E-2
1.
Disengage the side 1 shorting connector 963E-2 from the backplane of the switching cabinet according to the
following EQL:
EQL
TERM
128-156
112
NOTE:
See manufacturer note 21 for 963E-2 installation instructions.
11.39.24 Disconnect Side 1 ETR Cable Connector from the DLI
1.
Obtain the side 1 cable ED and group numbers from J-Drawing J-5D003LA-1 (see engineering note #66).
2.
Disconnect the ETS cable from the following EQL:
EQL
TERM
128-156
100
11.39.25 Disengage the 127C Apparatus Mounting Retainer for Side 1
1.
Disengage the 127C retainer from the following EQL:
EQL
TERM
128-156
1B0
NOTE:
See manufacturer note 38 and Table 8A for 127C installation instructions.
11.39.26 Install Side 1 Pin Protectors on the Backplane
1.
Install the side 1 plastic pin protectors on the backplane according to the following EQL:
EQL
TERM
128-156
006
128-156
106
11.39.27 Reseat Side 1 MCTU Fuse
1.
Reseat the side 1 MCTU Fuse and twist the fuse to the right according to the following EQL:
EQL
128-156
11.39.28 Reseat DLI Side 1 Pack
1.
Reseat and engage the DLI side 1 pack (TN1077) into the SM frame.
11.39.29 Power Up the DLI Side 1
235-105-210
October 1999
Copyright © 1999
Page 7
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...