Preparing for the Installation
Moving the Switch to the Installation Site
Beta Draft Confidential
CBX 500 Multiservice WAN Switch Hardware Installation Guide
4/5/03
3-3
Moving the Switch to the Installation Site
Due to the large size and weight of a fully configured switch, Lucent recommends
moving the switch to the installation site before unpacking it from the shipping carton.
Unpacking the Switch
To unpack the switch:
1. Open the carton and remove all enclosed packing materials. Save the packing
materials in case you need to repack the switch later.
2. Check the contents of the carton against the items listed on the packing slip.
3. Using a #2 Phillips-head screwdriver, remove the screws from the L-brackets on
the delivery pallet (see
Figure 3-1 on page 3-2
).
4. Carefully remove the switch from the pallet.
!
Caution – A fully configured switch weighs up to 200 pounds. To avoid potential
injury, use a hand lift for moving or rack-mounting the switch.