List of Figures
363-206-208
Issue 5 November 2000
[YLL
Lucent Technologies - Proprietary
See Notice on first page
Figure 3-20. Single Shelf DS1 Sync Timing, TL1/X.25 Interface,
Order Wire, and Modem Cabling
Figure 3-21. DS1 Sync Timing, TL1/X.25 Interface, Order Wire, and
Modem Cabling
Figure 3-22. DS1 Sync Timing, TL1/X.25 Interface, Order Wire, and
Modem Cabling for DDM-2000 OC-3/OC-12 Combined Bay 3-67
4
DDM-2000 OC-3/OC-12 Bay Installation
Figure 4-1.
ED8C906-300 Groups 4 and 6 OC-3/OC-12 Bays
Figure 4-2.
OC3/OC12 Bay Installation
Figure 4-3.
Junction at Bottom of Adjacent Bays
Figure 4-4.
DDM-2000 OC3/OC12 Bay Fuse Panel
5
Powering, Verification, and Circuit Pack Installation for the
DDM-2000 OC-12 Multiplexer
Figure 5-1.
BBG5 SYSCTL Option Setting Guidelines
Figure 5-2.
Power Cabling
Figure 5-3.
BBG5 SYSCTL Option Switches (Sheet 1 of 4)
Figure 5-4.
BBG8 SYSCTL Option Switches (Sheet 1 of 2)
Figure 5-5.
BCP1 OHCTL Option Switches (Sheet 1 of 2)
Figure 5-6.
BBG11/BBG11B 3DS3 Option Jumpers
Figure 5-7.
BBG12 3STS1E Option Jumpers
Figure 5-8.
BBF2B/BBF4 TGS Option Switches for OC-12 Multiplexer
(Sheet 1 of 2)
6
Stand-Alone (Local) Installation Tests for the DDM-2000 OC-12
Multiplexer
Figure 6-1.
DDM-2000 OC-12 User Panel
Figure 6-2.
Lightguide Buildout Assembly Change Procedure
Summary of Contents for DDM-2000 OC-12
Page 4: ......
Page 370: ...GL 22 Issue 5 June 2000 363 206 208 Glossary ...
Page 382: ...363 206 208 Index 1 ...