Order:
Circuit
363-206-295
NTP-
012
12
of
7
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
nodes
DRI
at
test
line
OC-3/IS-3
end-to-end
Perform
(for
node
secondary
FT-2000
the
with
associated
1).
Figure
in
D
and
A
nodes
between
example,
14.
DLP-552
the
use
node,
DRI
OC-3/IS-3
the
At
ent-crs-sts1
or
ent-crs-vt1
and
"drop
proper
make
to
commands
cross-connections.
continue"
15.
DLP-549
FT-2000
the
At
primary
the
use
node,
FAULT-
Switch-Path-STS3-Line-Manual
to
command
to
node
primary
from
tributary
designated
the
switch
See
node.)
secondary
to
traffic
(Switch
node.
secondary
2.
Figure
16.
17.
NOTE:
cross-
same
the
using
be
to
going
is
pack
circuit
OC-3/IS-3
the
If
only
the
then
removed,
be
to
is
that
pack
circuit
EC-1
the
as
connects
where
node
the
at
those
are
deleted
be
to
need
that
cross-connects
cross-
pass-through
The
replaced.
being
is
pack
circuit
the
remain.
can
connections
the
at
cross-connections
interface
EC-1
the
Discontinue
FT-2000
the
with
associated
node
OC-12
primary node.
are
node
DRI
the
at
cross-connections
only
that
Note
of
procedures
the
using
when
discontinued
being
NTP-025.
NTP-025