NTP-
013
363-206-295
Order
Circuit
:
1997
December
1,
Issue
8
of
4
Page
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
having
nodes
interworking
ring
dual
of
set
first
the
At
both
remove
replaced,
packs
circuit
3STS1E circuit
both
and
node
OC-12
the
from
packs
STS1E circuit
1.
Figure
see
example,
(For
node.
OC-3
the
from
packs
the
Remove
3STS1E
at
OC-12
the
from
packs
circuit
the
and
D
node
STS1E
at
OC-3
the
from
packs
circuit
G.)
node
5.
depress
momentarily
nodes,
OC-3
and
OC-12
both
At
the UPD/INIT
the
on
pushbutton
SYSCTL
the
use
or
upd
internal
DDM-2000
the
update
to
command
list.
equipment
6.
OC-3
the
between
connections
EC-1/DS3
all
Remove
with
nodes
OC-12
and
3STS1E/STS1E
packs
circuit
removed.
7.
If
OLIU
21G/21G-U
the
set
node,
OC-12
in
installed
are
s
the
on
switch
option
OLIU
21G/21G-U
the
with
agree
to
s
facility.
optical
the
of
loss
8.
DLP-510
both
Install
OLIU
and
node
OC-12
the
in
(OC-3/IS-3)
s
both OLIU
node.
OC-3
the
in
(OC-3/IS-3)
s
9.
DLP-503