Order:
Circuit
363-206-295
NTP-
013
8
of
7
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
If
OLIU
21G/21G-U
the
set
node,
OC-12
in
installed
are
s
the
on
switch
option
OLIU
21G/21G-U
the
with
agree
to
s
facility.
optical
the
of
loss
18.
DLP-510
both
Install
OLIU
and
node
OC-12
the
in
(OC-3/IS-3)
s
both OLIU
node.
OC-3
the
in
(OC-3/IS-3)
s
19.
DLP-503
the
use
shelf,
DDM-2000
each
At
set-fecom:
address:com=enabled,nsus=ns/us
and
(fecom)
communications
far-end
enable
to
command
parameters.
(us)
Side
(ns)/User
Side
Network
set
20.
the
of
verification
and
connections
fiber
optical
Perform
facility.
optical
21.
DLP-551
nodes
DRI
at
test
line
OC-3/IS-3
end-to-end
Perform
1).
Figure
in
H
and
C
nodes
between
example,
(For
22.
DLP-552
the
use
nodes,
DRI
upgraded
the
At
ent-crs-sts1
or
ent-crs-vt1
and
"drop
proper
make
to
commands
cross-connections.
continue"
23.
DLP-549
24.
complete.
now
is
upgrade
The