NTP-
025
363-206-295
Order
Circuit
:
1997
December
1,
Issue
5
of
2
Page
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
2.
NOTE:
alarm.
minor
or
major
office
the
activate
may
operation
following
The
the
depressing
by
suppressed
be
may
alarm
audible
The
ACO button.
terminating
the
at
panel
cross-connect
cable
EC-1
the
At
the
with
associated
signal(s)
EC-1
the
remove
nodes,
(
discontinued.
being
port(s)
FAULT
flashing
begin
LEDs
on 3STS1E
removed.)
signals
with
pack
circuit
3.
NOTE:
The UPD/INIT
the
on
pushbutton
SYSCTL
its
prevent
to
recessed
is
a
as
such
object,
pointed
small
a
need
will
You
operation.
accidental
it.
operate
to
pen,
ball-point
the
depress
momentarily
nodes,
terminating
the
At
UPD/INIT
the
on
button
SYSCTL
the
use
or
pack
circuit
upd
(Flashing
list.
equipment
the
update
to
command
FAULT
off.)
go
LEDs
the
use
available,
is
(CIT)
terminal
interface
craft
a
If
rtrv-state-eqpt:
right
the
that
verify
to
command
from
changed
been
has
port(s)
in-service (
i
to
)
auto (
a
)
nodes.
terminating
the
at
state
4.