NTP-
004
363-206-295
Turnup
System
:
1997
December
1,
Issue
15
of
8
Page
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
3:
NOTE
on
connectors
optical
Unused
OLIU
until
looped
remain
should
s
made.
are
connections
line
optical
optical
the
remove
node,
host
OC-12
end
near
the
At
the
from
loop
OLIU
OC-3
UNITS
FUNCTION
used
being
3,
Figure
in
example,
(for
configuration
ring
OC-3
the
for
slot
5,
Node
shelf
OC-12
FN-A-1
the
of
end
other
the
At
)
loop
optical
the
remove
established,
being
span
optical
associated
the
from
OLIU
OC-
3,
Figure
in
example,
(for
7
Node
shelf
3
OLIU
MAIN-1
.
13.
NOTE:
end
far
for
used
(DCC),
channel
communication
data
section
The
(shelf)
element
network
each
at
enabled
be
must
communications,
to
tests
line
end-to-end
the
for
order
in
tested
being
interface
optical
has
it
If
"enabled".
is
channel
DCC
the
for
condition
Default
work.
the
use
disabled,
been
set-fecom:
command
shelf
each
at
to
communications.
end
far
enable
the
use
shelf,
each
At
set-fecom:
address:com=enabled
to
command
enabled.
is
(fecom)
communications
end
far
ensure
the
of
verification
and
connections
fiber
optical
Perform
established.
being
span
optical
the
of
integrity
14.
DLP-551