DDM-2000 OC-3/OC-12 Bay Installation
Lucent Technologies - Proprietary
See Notice on first page
Bay Anchoring
Network bay frames are approved for Seismic Zones 0, 1, 2 only, while Seismic bay
frames are approved for all Seismic Zones. The bay anchor type and quantity required
for bay installation are shown below:
Tools, Test Sets, and Accessories
The following tools or equivalent are required:
Qty
Description
4
402980056 Hilti Fastening Systems #590024.500
*
*
Drop-In Anchors for floor supported only Network type frames
in Seimic Zone 0, 1,2.
4
406899229 Hilti Fastening Systems #00217742
†
†
Heavy Duty Anchors for floor supported only 600 type frames
in all Seimic Zones.
2
402980056 Hilti Fastening Systems #590024.500
‡
‡
Drop-In Anchors for top and floor supported Network type
frames in Seimic Zone 0, 1,2.
2
406899229 Hilti Fastening Systems #00217742
**
**
Heavy Duty Anchors for top and floor supported Seimic type
frames in all Seimic Zones.
Quantity
Description
1
Vacuum Cleaner
*
*
Required for cleaning area after floor drilling.
1
Drill Hammer (for 5/8 drill)
†
†
Required for drilling floor.
1
Safety Goggles
‡
‡
Safety requirement when floor drilling.
1
406902049 Anchor Setting Tool (for drop-in anchors)
**
**
Required for setting drop-in anchors.
1
3/4” Torque Wrench (25 ft.-lbs for 1/2 bolt)
††
†† Required for proper anchor nut torque.
1
Rope and 5/8-11-inch eye bolt
‡‡
‡‡ Accessories for uprighting bay if other means of lifting not available
1
Level
***
*** Required during bay alignment