3-6 Issue 9 October 1998
363-206-204
Equipment and Front Access Cable Installation
2. Remove the front, rear, and DS1 cable chamber covers from the
DDM-2000 OC-3 shelf.
NOTE
:
The covers must be installed later to assure compliance with electromag-
netic induction requirements. Also to ensure proper cooling when used with
a fan shelf.
3. Inspect the DDM-2000 OC-3 shelf for visible damage including bent or
touching backplane pins.
4. Determine the type of bay frame the DDM-2000 OC-3 shelf will mount in.
Position the DDM-2000 OC-3 shelf side mounting brackets (if necessary),
accordingly. Refer to Figure 3-6.
NOTE
:
To assure that the shelf is grounded through the bay frame, the mounting
brackets must be positioned so that the head of the mounting screw makes
contact with the unpainted surface of the bracket.
5. Position the side mounting brackets of the DDM-2000 OC-3 heat baffle
and/or fan shelf (if provided), accordingly. Refer to Figure 3-6.
Equipment Installation - Front Access
Description
This procedure describes how to install equipment that will ONLY be accessible
from the front. This procedure requires attaching the backplane cables to the shelf
prior to mounting the shelf in the bay.
NOTE
:
Shelves, heat baffles, and/or fan shelves should be spaced as shown in
Figure 3-5 and Figure 3-6.
NOTE
:
For backplane connections refer to Figure 3-1.
NOTE
:
Cables should be placed in the bay frame as shown in Figure 3-2.
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...