8. Using a voltmeter, measure the voltage on the power cable between BAT A
and BAT A RTN, and then between BAT B and BAT B RTN. If a bay
arrangement cable is being used, measure the voltage between BAT A and
BAT A RTN and between BAT B and BAT B RTN on each connector of the
power cable.
Requirement: The voltage MUST be between 41.75 and 60.0 V DC.
9. Reconnect the "A" feed of the power cable to the backplane cable (P1 to
J1).
10. Verify the PWR ON LED on the DDM-2000 OC-3 user panel is lighted with
only the "A" feed connected.
11. Disconnect the "A" feed of the power cable from the backplane cable (P1
from J1).
12. Reconnect the "B" feed of the power cable to the backplane cable (P2 to
J2).
13. Verify the PWR ON LED on the DDM-2000 OC-3 user panel is lighted with
only the "B" feed connected.
14. Reconnect the "A" feed of the power cable to the backplane cable (P1 to
J1).
15. Verify that the PWR ON LED on the DDM-2000 OC-3 user panel is lighted
with both the "A" and "B" feed connected.
16. Repeat the above powering procedure for the ED-8C733-30, G2 or G7 fan
shelf, if provided, and verify that the PWR ON LED on the fan shelf lights
and the fans operate. Press the RESET button on the fan shelf to extin-
guish the fan shelf alarm indication.
Circuit Pack Compatibility - Release 13
Table 4-1 lists the circuit packs that are compatible with Release 13.
Designation
Color
BAT A
Red
BAT A RTN
Black
BAT B
Green
BAT B RTN
White
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...