6-8 Issue 9 October 1998
363-206-204
Release 7 Installation Tests
LED Test
Description
This test verifies proper operation of all the LEDs on the DDM-2000 OC-3 shelf.
Operation of all the LEDs is necessary to assist in trouble isolation.
If there are any LED failures, determine if the problem is with the circuit pack or
shelf and replace the faulty unit.
If the shelf is not fully equipped, move circuit packs around and repeat the test in
all circuit pack positions.
Procedure With a Terminal
Issue the command
test-led;
.
The DDM-2000 OC-3 will respond with
In Progress ....
for the duration of the test and will issue a prompt CMPLD when the test has
completed. All LEDs on the shelf under test should light for 10 seconds, then
extinguish for 10 seconds. Then the proper LEDs will light to indicate the shelf’s
current status.
Procedure Without a Terminal
Press and hold the ACO pushbutton on the user panel. While the pushbutton is
pressed, all LEDs on the shelf under test should light.
NOTE
:
If the ACO pushbutton is pressed for more than 2 seconds the 7-segment
display will go blank, then it will display the currently running software
release on this shelf one character at a time.
Local Equipment and Cross-Connect
Test
Description
This test verifies proper operation of the circuit packs and the circuit pack
positions, which are equipped in the DDM-2000 OC-3 shelf. It verifies proper
cabling from the DDM-2000 OC-3 to the DSX cross-connect panel or connecting
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...