10-16 Issue 9 October 1998
363-206-204
Operational Tests
17. At the CO, remove the closure between miscellaneous (environmental)
input #1 and input common.
18. At the RT, verify that the closure is removed.
19. Repeat for each CO miscellaneous (environmental) input (#2 through #4).
Modem Connection Test
Description
This test will verify the proper login procedure using a craft interface terminal (CIT)
(rear CIT only) connected to a modem, which is connected to the modem port.
Only test if a modem is required.
Procedure
1. Verify that the modem cable is properly connected to the DDM-2000 OC-3
CIT-2 port (backplane connector J52).
NOTE
:
The CIT-2 port (J52) does not require the use of a null modem if it is con-
nected to a modem.
NOTE
:
If you are unfamiliar with the use of a terminal, refer to the "Use of Termi-
nal" in the "Installation Test" section of this manual.
NOTE
:
If a successful login is established through a modem, the modem connec-
tion has been verified. The use of a terminal through a modem is the same
as connecting a terminal to the EIA-232D port on the user panel.
2. Verify operation through the modem by performing the "Manual Protection
Switching Test" of this section using the present modem connection.
TL1/X.25 Connection Test
For Releases 6 and 7, the DDM-2000 OC-3 shelf directly connected to the X.25
interface must be provisioned as the GNE (Gateway Network Element) with the
set-ne;
command. For Releases 8, 9, 11 and 13, no provisioning is necessary.
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...