GL-4 Issue 9 October 1998
363-206-204
GLOSSARY
BITS
Building Integrated Timing Supply — A single clock that provides all the DS1 and
DS0 synchronization references required by clocks in a building.
BRI
Basic Rate Interface.
Broadband
Any communications channel with greater bandwidth than a voice channel; some-
times used synonymously with wideband. However, wideband FM is not the same
as broadband.
C
CC
Clear Channel — A provisionable mode for the DS3 output that causes parity vio-
lations not to be monitored or corrected before the DS3 signal is encoded.
CEV
Controlled Environment Vault
CIT
Craft Interface Terminal. The connector on the front of a shelf which is used to
gain access to the condition of the shelf and system and through which system
parameters and values can be changed
CCITT
International Telephone and Telegraph Consultative Committee — An interna-
tional advisory committee under United Nations’ sponsorship that has composed
and recommended for adoption worldwide standards for international communica-
tions. This function is now under the auspices of the ITU (International Telecom-
munications Union). See ITU.
CLF
Carrier Line Failure Status.
CLK
Clock.
CMOS
Complementary Metal Oxide Semiconductor.
CO
Central Office.
COACH
A system of on-line support tools aimed at providing product news and bulletins,
diagnostic services, compatibility information, and on-line documents.
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...