363-206-204
GLOSSARY
Issue 9 October 1998 GL-5
CP
Circuit Pack
CR
Critical (alarm status)
CSA
Carrier Serving Area.
CS&O
Customer Support and Operations.
CTS
Customer Technical Support
CTS
Clear to Send in TL1/X.25 telemetry.
CV
Coding Violation (a performance-monitoring parameter).
CVFE
Coding Violation Far-End — An indication returned to the transmitting terminal
that an errored block has been detected at the receiver terminal of a terminal
other than the one to which you are physically connected.
D
DACS III-2000
Digital Access and Cross-Connect System that provides clear channel switching
at either the DS3 or the STS-1 rates, eliminating the need for manual DSXs.
DACS IV-2000
Digital Access and Cross-Connect System that provides electronic DS3/STS-1 or
DS1/VT1.5 cross-connect capability, eliminating the need for manual DSXs.
DCC
Data Communications Channel — The embedded overhead communications
channel in the SONET line. It is used for end-to-end communications and mainte-
nance. It carries alarm, control, and status information between network elements
in a SONET network.
DCE
Data Communications Equipment — In a data station, the equipment that pro-
vides the signal conversion and coding between the Data Terminating Equipment
(DTE) and the line. The DCE may be separate equipment or an integral part of the
DTE or of intermediate equipment. A DCE may perform other functions usually
performed at the network end of the line.
Summary of Contents for DDM-2000 OC-3
Page 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Page 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Page 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Page 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Page 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Page 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Page 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Page 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Page 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Page 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Page 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Page 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Page 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Page 492: ...IN 14 Issue 9 October 1998 ...