Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-403
2 - Table of Contents
Issue 4 February 1997
Charge Capacity and Recharge Time
Battery String Voltage Drop and Balancing
Battery Size versus Voltage Drop
Lineage® 2000 Engineering Specifics
Low-Voltage Disconnect/Reconnect Feature
Installation Tools and Test Equipment
Suggested Installation Sequence
Unpacking, Handling, and Frame Installation
Cable Support and Ground System
AC Wiring, Rectifier Installation and Test
Battery Connections, Disconnect Installation, and Test 4 - 9
Controller Test