Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-403
Issue 4 February 1997
Installation 4 - 3
physical damage. (Routing of control leads within the
controller is described in the Controller manual.)
6. All bolts making electrical connections should be torqued
to the values in Table 4-A; all bolts for mechanical
connections should be torqued to values in Table 4-B.
Sequence of
Tasks
To install the H569-403 ECS Battery Plant, complete the
following sequence of tasks.
Unpacking,
Handling, and
Frame
Installation
Before opening the packaging, carefully inspect the outside, in
the presence of shipping personnel, for signs of damage. If
damaged, follow the shipping carrier's procedure for filing a
damage claim.
To ensure personnel safety and equipment protection use
appropriate equipment during handling of crates and uncrated
equipment. Use the equipment weights and dimensions, given in
Section 2.1, as a guideline for choosing material handling tools.
Move crated equipment to an area with adequate space and tools
for unpacking and handling.
Carefully open the packaging to verify that the contents are
complete and undamaged. If the equipment must be returned,
repack it in the original shipping crate.
Locate, shim and anchor the framework. Figure 4-1 shows
typical floor mounting details for concrete floors. Other types of
floor construction may require other mounting methods. Holes
can be located using Figure 4-2. Note that primary mounting
locations are at the outermost corners of each set of four holes
(four anchoring devices per bay). Select alternate locations if
primary locations would interfere with floor reinforcing bars.
For multi-bay plants and for plants in aisle line-ups with
compatible framework, frames may be tied together for extra
rigidity.)