Engineering, Planning, and Ordering 3 - 19
Step H: Record in Table 3-G the wire sizes for each battery
feeder.
Step I: Calculate the minimum wire size that meets the
ampacity requirement based on the total plant List 1 drain
divided by the number of parallel battery strings.
Step J: Enter that wire size on the first line in Table 3-G.
Step K: Calculate the minimum wire size for each battery feeder
in Table 3-B to meet the voltage drop requirements outlined in
paragraphs “Battery Size versus Voltage Drop” and
“Calculating Voltage Drop.”
Step L: List the sizes based on voltage drop in Table 3-G.
Step M: Indicate the larger size for each load feeder in the final
column, “Selected Wire Gauge.”
Table 3-D: Double Hole Terminal Lugs
KS-5482
Wire
KS-20921
Wire
WP-91412
List
Comcode
Bolt Size
Centers
Die
10
8
8
6
4
2
-
1/0
-
2/0
-
4/0
-
350MCM
-
10
8
8
6
4
-
2
-
1/0
-
2/0
-
4/0
-
350MCM
73
52
75
3
5
54
8
56
57
57
77
59
27
61
56
405356171
405348178
406216626
405347519
405347576
40 5348202
405347683
405348228
405348236
405348236
4060 21725
405348251
405347923
405348277
405348228
10
10
0.250
0.250
0.250
0.250
0.250
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.375
0.625
0.625
0.625
0.625
0.625
0.625
0.625
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
R5473
Red
Red
Blue
Grey
Brown
Green
Pink
Black
Black
Orange
Purple
Yellow
Red
Red