Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-403
Issue 4 February 1997
Installation 4 - 9
Battery
Connections,
Disconnect
Installation, and
Test
Remove all fuses from CP5 Fuse Board. Confirm that the output
circuit breakers of all rectifiers and that all distribution breakers
are open.
Interconnect the battery strings and, if provided, the emergency
disconnect circuit, as instructed by the battery manual or other
manufacturer's documentation.
Run all cables from the battery and return bus bars to the battery
strings by first connecting them to the bus bars in the dc
distribution subsystem. For suggested cable routing within the
dc distribution see the H569-403 drawing. Replace the dc
distribution cover panel on the plant framework after all
connections have been made at the plant bus bars.
Terminate the cables from the dc distribution at each battery
string according to the manufacturer's documentation. Measure
the resistance between the two ends of any battery string to
verify that the circuit is open. Close the last remaining part of the
battery circuit on each string (either intercell connector or
disconnect breaker).
Reinsert all fuses in CP5 Fuse Board. Match the fuse ratings and
positions as indicated on the distribution cover panel.
Controller Test
Follow the controller test procedure given in the ECS controller
manual to complete the steps below.
1. Test Enable/disable equalize charge feature.
2. Test Enable/disable rectifier restart feature.
3. Test HV shutdown level(s).
DANGER
The next step in this procedure will apply battery power to the
battery plant. Before contacting any uninsulated conductor
surfaces, always use a voltmeter to insure that no voltage, or
the expected voltage, is present.
Note
The white indicators on F1 through F11 and F13 represent a
1-1/3 ampere rating, the orange indicator on F12 represents a
2 ampere rating and the green indicator on F19 through F21
represents a 5 ampere rating.