Lucent Technologies Supplemental Battery Stand J85504D-1 List 16
Issue 2 September 2000
Installation Guidelines and Preparations 5 - 3
The floor loads for the stands in this section are shown in Table 5-A. See
Figure 5-1.
Note
The floor load for the battery stand equipped with batteries is
computed by averaging the load over the floor area bounded by the
stand outline (sides) and the center lines of the front and rear aisles.
Special precautions (such as increasing aisle widths or space from
adjacent equipment) must be taken to insure that this equipment does
not overload the floor on which it will be used.
Table 5-A: Battery Stand Floor Load Data
Battery
Stand
List No. Battery
No of
Shelves
Stand
Weight
lbs
Stand
Loaded
Weight
lbs
Floor
Area
sq ft
Floor
Load
lbs/sq ft
Floor
Area
(w/Front
and Rear
Aisles)
sg ft
Floor
Load
(w/Front
and Rear
Aisles)
lbs/sq ft
J85504D-1
16
12IR125
4
290
2210
4.54
486
10.38
190
J85504D-1
16
C11
4
290
1876
4.54
413
10.38
161
Figure 5-1: Area Used for Floor Load Calculations
(Stand Foot-print With Front and Rear Aisles)
Center of Aisle
Floor Loading Area
Equipment Footprint
Center of Aisle
2'6"
Rear Aisle
2'-7.68"
Stand Width
1'-8.18"
Stand Depth
2'6"
Center Aisle