Routing and layout
The upper and lower subracks have the cabling at the rear side: the B
(IN/OUT) to the left and the A (IN/OUT) to the right.
Figure 4-30 Routing and layout
External cable installation
TI-E1 Station clock I/O interface (75
Ω
)
System cabling and final assembly
....................................................................................................................................................................................................................................
4 - 4 6
Lucent Technologies
365-374-074
Issue a, April 2002