Physical and power installation exit checklist
....................................................................................................................................................................................................................................
Checklist
Verify that all procedures described below has been completed. If a
procedure was not applicable, indicate “N/A”.
Procedure
Result
(Passed, Failed,
N/A)
Initials
Notes
Rack floor mounting
Anti Recirculation
Plate mounting
Rack adapter kit
mounting
Subrack mounting
Power cabling
Ground cabling
Subrack alarm cabling
Station alarm interface
cabling
MDI/MDO cabling
User byte cabling
Station clock cabling
LAN cabling
Fiber cabling
Side cover plate
mounting
Rack door mounting
Powering
Fan unit test
Circuit pack
installation
NE software
installation
Circuit pack installation
Powering, circuit pack installation, and NE software
download
....................................................................................................................................................................................................................................