Entry checklist
....................................................................................................................................................................................................................................
The following provides a checklist to be completed prior to perform
the WaveStar
®
CIT installation, NE provisioning and stand alone
installation tests. Verify that each procedure has been completed.
Check off and initial the item.
Procedure
Completed
Initials
Notes
Have all procedures been completed which are
required in Chapter 5,
installation exit checklist” (5-19)
Is the CD-ROM (CC109088708) available
which contains WaveStar® CIT and the NE
software?
Is a laptop or desktop PC available meeting the
minimum requirements (see section
Is a crossed LAN cable CAT5 with 4-wire
RJ-45/RJ-45 connectors available?
Is the following test equipment available?
•
Optical power meter with LC connectors
•
Multimeter