NE provisioning and stand alone installation test exit checklist
....................................................................................................................................................................................................................................
Checklist
Verify that all procedures described below has been completed. If a
procedure was not applicable, indicate “N/A”.
Procedure
Result
(Passed, Failed,
N/A)
Initials
Notes
WaveStar® CIT
installation
NE login
NE name (TID)
provisioning
Provisioning of the
system parameters
Provisioning of the
timing references
Provisioning of the
system timing
LED test
Alarm reporting test
NE synchronisation test
Optical power meter
test
Port and cross-connect
test
Stand alone test procedures
....................................................................................................................................................................................................................................
7 - 1 8
Lucent Technologies
365-374-074
Issue a, April 2002