SDH test procedures
Overview
....................................................................................................................................................................................................................................
Purpose
This chapter describes all the tests that should be carried out to check
the functionality of the system.
Assumptions
Be sure all listed assumptions described below are fulfilled before
carrying out any tests:
•
All NEs must be mounted and cabled correctly.
•
The people carrying out the tests are familiar with the SDH
functionality, the WaveStar
®
CIT software and the handling of the
test equipment.
Related information
An overview about all WaveStar CIT related tasks is given in the “
LambdaUnite
™
MultiService Switch (MSS) User Operations Guide”.
Contents
Span/Ring testing exit checklist
Span / Ring testing
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
8 - 9