............................................................................................................................................................
8
Mount the mounting brackets (bracket, front-left, Unite —
DC1003774 (item 1) and (bracket, front-right, Unite — DC1003775
(item 2), on the upright of the rack frame in the brackets
configuration positions by using (Screw, Tapping Thread-Forming,
M6x16 — CC901331421 (item 4), but do not completely fasten the
brackets.
............................................................................................................................................................
9
Mount the subrack on the mounting brackets at the front from inside
the subrack by using a Screw Hexagon Socket Button Head M4x8 —
DC1002976 (item 7), but do not completely fasten the brackets.
............................................................................................................................................................
10
Fasten the front and rear Screw, Tapping Thread-Forming, M6x16 —
CC901331421 (item 4) and Screw Hexagon Socket Button Head
M4x8 — DC1002976 (item 7).
............................................................................................................................................................
11
Mount the Fiber-Routing Guides (corner) — DC1001518 (item 3) at
each corner of the subrack by clicking them into the holes inthe top
and bottom sides of the subrack.
ETSI-2 installation
Mounting the subrack into rack
Mechanical installation
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
3 - 2 5
E
N D
O F
S
T E P S
............................................................................................................................................................