Physical installation check
....................................................................................................................................................................................................................................
Overview
A complete physical installation check should be done to ensure that
all components are complete and the cables are connected correctly. It
should also be checked if the NE is up and running.
Checks
Check that
•
there are no visible defects
•
the mechanical parts are secured
•
all cables are assembled correctly
•
the optical couplings are affixed to the optical circuit packs
•
all circuit packs are situated in the slots according to the
guidelines described above.
•
the NE is up and running.
Circuit pack installation
Powering, circuit pack installation, and NE software
download
....................................................................................................................................................................................................................................
5 - 1 8
Lucent Technologies
365-374-074
Issue a, April 2002