...........................................................................................................................................................................................................................................................
Installation Tests
Local Equipment and Cross-connect Tests
6 - 1 2
365-372-334 R2.0
Issue 4, November 2004
...........................................................................................................................................................................
Step 8
Verify that an alarm is present on the port that the test set connections
have been removed from. Use the rtrv-alm-all command in the
Command Builder window.
...........................................................................................................................................................................
Step 9
Repeat entire procedure on each of the remaining DS1 tributaries of
function group B.
...........................................................................................................................................................................
Step 10
Use the scroll bar in the
Command Builder
window to scroll down to
the
upd-sys
command.
...........................................................................................................................................................................
Step 11
Click on the
upd-sys
command.
...........................................................................................................................................................................
Step 12
Click
Send
to issue the command.
Result:
This command will remove alarms generated by removing
the test signals from the DSX-1.
...........................................................................................................................................................................
Step 13
Check off the appropriate box in Appendix E, Installation Checklist.
End of Steps
DS3 Testing Procedure
Perform the following steps to verify backplane cabling to B-Group
function slot of the access panel.
Cabling to DS3 connectors located on the access panel are via
backplane connections. If a VLNC5 (OC3/16DS1/2DS3) or VLNC25
(OC12/16DS1/2DS3) main pack is installed, DS3 cabling will need to
be tested.
Important!
This procedure requires the use of a DS3 test set.
Step 1
Set the DS3 test set to transmit and receive a valid signal.
...........................................................................................................................................................................
Step 2
Connect an input and output cable from the DS3 test set to the
associated input and output of the DS3 port on the access panel.
Summary of Contents for Metropolis DMXplore
Page 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Page 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Page 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Page 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Page 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...