Ring Setup and Testing: Integration Procedures
Fiber Installation
8 - 4
365-372-334 R2.0
Issue 4, November 2004
............................................................................................................................................................................................................................................................
Fiber Installation
Description
This section is used to verify proper fiber connections between
Metropolis
®
DMXplore nodes.
Prerequisite
The following is a list of items to verify before beginning tests in this
section.
•
Two people are required to perform the end-to-end turn up in
this section (one at each adjacent node).
•
The Metropolis
®
DMXplore Main OLIUs should be optically
looped from the previous section. Verify that the Metropolis
®
DMXplore shelf is clear of all alarms (only green LEDs are
lighted) prior to and after completing this test.
•
CIT is still connected to the Metropolis
®
DMXplore and
Command Builder is running.
•
The office alarm cable will remain disconnected during this
procedure.
CAUTION
...........................................................................................................................................................................
A properly grounded ESD wrist strap MUST be worn when
handling circuit packs.
WARNING
Unterminated optical connectors may emit laser radiation. Do
not view beam with optical instruments.
...........................................................................................................................................................................
Summary of Contents for Metropolis DMXplore
Page 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Page 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Page 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Page 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Page 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...