...........................................................................................................................................................................................................................................................
Ring Setup and Testing: Integration Procedures
Fiber Installation
8 - 8
365-372-334 R2.0
Issue 4, November 2004
...........................................................................................................................................................................
Step 17
At each end of the optical spans, connect the optical fiber transmit
cables to the OLIU OUT connectors.
...........................................................................................................................................................................
Step 18
At each end of the optical span, measure the optical power of the
optical fiber receive cables using an optical power meter.
...........................................................................................................................................................................
Step 19
Select the appropriate LBO value required based on the received
optical power measurement. Attenuate to the middle of the allowable
optical receive power range. Refer to the following table for the
DMXplore Main circuit pack receive levels.
...........................................................................................................................................................................
Step 20
Select the proper LBO based on the value required and the comcode as
listed below.
...........................................................................................................................................................................
Step 21
Clean LC LBOs and install LBO assemblies in the OLIU IN connector.
...........................................................................................................................................................................
Step 22
At the far end, connect the input optical fiber to the proper OLIU IN
connector.
Requirement:
The FAULT LED on the OLIU extinguishes after
approximately 10 seconds.
Optics
Circuit Pack
Received Power(dBM)
Long Reach (LR) Optics
VLNC6
0 to -34.0
Long Reach (LR) Optics
VLNC5
0 to -34.0
Long Reach (LR) Optics
VLNC25
-7 to -30.5
Long Reach (LR) Optics
VLNC26
-7 to -30.5
Code
Comcode
Loss (dB)
ABLCS-05.0
108279381
5
ABLCS-10.0
108279431
10
ABLCS-15.0
108279480
15
ABLCS-20.0
108279530
20
Summary of Contents for Metropolis DMXplore
Page 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Page 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Page 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Page 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Page 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...