...........................................................................................................................................................................................................................................................
Installation Tests
Local Equipment and Cross-connect Tests
4 - 1 8
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 20
Under the
Parameters
section,
<STS1CRSDST>,
click on
{b}-{1}.
Double click on {
b
} and choose the Function Group where the LNW16
or LNW39 is located.
Result:
One of the following commands will be displayed in the
Command Builder
window to the left of the
Send
button.
dlt-crs-sts1:lt-dmxtend:m-1-1,b-1:ctag; (Function Group b)
dlt-crs-sts1:lt-dmxtend:m-1-1,d-1:ctag; (Function Group d)
dlt-crs-sts1:lt-dmxtend:m-1-1,g-1:ctag; (Function Group g).
............................................................................................................................................................................
Step 21
Click
Send
to issue the command.
Result:
The
Response Window
should display the command
followed by a
COMPLD
indication.
Result:
The DS3 test set should indicate a blue (AIS) signal is
being received in place of the PRBS signal.
............................................................................................................................................................................
Step 22
Remove the test set connections from the DSX-3.
............................................................................................................................................................................
Step 23
If there was a loopback removed in Step 8, replace it on the DSX-3
port.
............................................................................................................................................................................
Step 24
Use the scroll bar in the
Command Builder
window to scroll down to
the
upd-sys
command.
............................................................................................................................................................................
Step 25
Click on the
upd-sys
command.
............................................................................................................................................................................
Step 26
Click
Send
to issue the command.
Result:
This command will remove alarms generated by
removing the test signals from the DSX-3.
............................................................................................................................................................................
Step 27
Repeat Step 8 through Step 26 to test cabling to each of the remaining
DS3 tributaries of the Function Unit. Substitute the following