Installation Tests
Local Equipment and Cross-connect Tests
...........................................................................................................................................................................................................................................................
4 - 3 1
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 4
Remove the optical fiber jumper from the OC-3 OLIU (at the LGX).
Result:
The FAULT LED should begin flashing on the OC-3
OLIU and only the MN and NE LEDs should be lit on the SYSCTL
circuit pack.
............................................................................................................................................................................
Step 5
Use the scroll bar in the
Command Builder
window to scroll down to
the
upd-sys
command. Click on the
upd-sys
command.
............................................................................................................................................................................
Step 6
Click
Send
to issue the command.
Result:
The
Response Window
should display the command
followed by a
COMPLD
indication.
Requirement:
The flashing FAULT LED should extinguish on the OC-3 OLIU.
There should be no alarm indications on the Metropolis
®
DMXtend
shelf.
............................................................................................................................................................................
Step 7
Repeat this entire procedure for each LNW37 SFP equipped in the
Metropolis
®
DMXtend shelf.
............................................................................................................................................................................
Step 8
Replace all protective dust covers on the LNW37 SFP OC-3 OLIU
connectors (OLIU and LGX), that were removed to perform this
procedure.
............................................................................................................................................................................
Step 9
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps