...........................................................................................................................................................................................................................................................
Ring Setup and Testing: Integration Procedures
Fiber Installation
6 - 4
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................................................................................................
Fiber Installation
Description
This section is used to verify proper fiber connections between
Metropolis
®
DMXtend nodes.
Prerequisite
The following is a list of items to verify before beginning tests in this
section.
•
Two people are required to perform the end-to-end turn up in
this section (one at each adjacent node).
•
The Metropolis
®
DMXtend Main OLIUs should be optically
looped from the previous section. Verify that the Metropolis
®
DMXtend shelf is clear of all alarms (only green LEDs are
lighted) prior to and after completing this test.
•
CIT is still connected to the Metropolis
®
DMXtend and Com-
mand Builder is running.
•
The office alarm cable will remain disconnected during this
procedure.
•
A properly grounded ESD wrist strap must always be worn
while handling circuit packs.
CAUTION
...........................................................................................................................................................................
A properly grounded ESD wrist strap MUST be worn when
handling circuit packs.
WARNING
Unterminated optical connectors may emit laser radiation. Do
not view beam with optical instruments.
............................................................................................................................................................................