Equipment and Cable Installation for Metropolis
®
DMXtend
Shelf Horizontal Bay Mount
Metropolis
®
DMXtend Shelf Installation
1 - 1 4
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
into place. Run the excess fiber per office practices around the spools to
minimize the bend radius See Figure 1-5, Fiber spools (page 1-14)
............................................................................................................................................................................
Step 11
If Lucent fiber ducts are used, See Figure 1-5, Fiber spools (page 1-14)
All high speed fibers are to be run in the duct closest to the shelf for
both left and right ducts. The next two ducts away from the shelf are for
low speed fibers.
Figure 1-5
Fiber spools
............................................................................................................................................................................
Step 12
Verify with an ohmmeter that the Metropolis
®
DMXtend shelf is
grounded to the bay frame. Measure between the Metropolis
®
DMXtend shelf mounting bracket and the office ground lug on the bay
frame.
Requirement:
The ohmmeter reads less than 1 ohm.
............................................................................................................................................................................
Step 13
Verify with an ohmmeter that the ESD Jack Stud mounted at the rear of
the shelf is grounded to the bay frame. Measure between the ESD Jack
Stud and the office ground lug on the bay frame.
Requirement:
The ohmmeter reads less than 1 ohm.
............................................................................................................................................................................
Step 14
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps