Alarm Mult
The following steps should be performed when the bottom shelf in the
bay will be directly connected to the office alarms. The cable added in
this procedure is to mult office alarms in a bay to the bottom shelf. In
this procedure the bottom shelf is multed to the shelf immediately
above. That shelf is then multed to the shelf above it. Continue until the
top shelf is connected.
Important!
In order for office alarms in a shelf (other than the
bottom shelf) to be reported, all office alarm cable mults from that
shelf to the bottom shelf must be in place. No shelf should be
skipped.
............................................................................................................................................................................
Step 6
Obtain the office alarm mult cable (848589602 for DMX or DMXtend)
or (848861530 for Lambda Unite). Connect one end to
ALM MULT
(J14)
of the Metropolis
®
DMXtend shelf. See Figure 1-23, Office
Alarm Cable Connections (page 1-68)
............................................................................................................................................................................
Step 7
Route the office alarm mult cable to the side of the bay and connect it
to
ALM (J13)
of the Metropolis
®
DMXtend shelf above.See
Figure 1-24, Office Alarm Cable Routing (page 1-68)
............................................................................................................................................................................
Step 8
Repeat this procedure for each shelf in the bay (stopping at the top).
............................................................................................................................................................................
Step 9
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps