...........................................................................................................................................................................................................................................................
Powering and Initial Circuit Pack Installation for
Metropolis
®
DMXtend Shelf Horizontal Bay Mount
Initial Circuit Pack Installation
2 - 2 6
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 5
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps
LNW42, LNW95 (R1.1)
Apparatus Blank
Installation (Optional)
Follow this procedure to install LNW42 or LNW95 (Supported starting
in release R1.1) Apparatus Blank(s) into the Metropolis
®
DMXtend
shelf.
Important!
A LNW42 or LNW95 (R1.1) Apparatus Blank is
required in any unequipped Main slots to provide proper air flow
for cooling.
Step 1
Identify any unequipped Main slots.
............................................................................................................................................................................
Step 2
Remove the LNW42 or LNW95 (R1.1) Apparatus Blank from the
packing material.
............................................................................................................................................................................
Step 3
Place the LNW42 or LNW95 (R1.1) Apparatus Blank into the
unequipped Main slot on the shelf. Do NOT engage the blank pack in
the backplane connector.
............................................................................................................................................................................
Step 4
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps