Installation Tests
Local Equipment and Cross-connect Tests
...........................................................................................................................................................................................................................................................
4 - 1 1
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 7
Under the
Parameters
section,
<VT1AIDCRSDST>
, click on
{a}-{1}-
{1}-{1}
.
Double click on {a} and choose the Function Group where the LNW6/
LNW7/LNW8/LNW39 is located.
Result:
A command similar to the following example should be
displayed in the command window to the left of the
Send
button
Example for Function Unit
A
:
ent-crs-vt1:lt-dmxtend:m-1-1-1-1,a-1-1-1:ctag::2WAYPR;
This command creates a cross-connect to map the first DS-1 of a
LNW39 circuit pack in Function Unit
A-1
and/or
A-2
slot(s) to the first
VT1.5 within the first VT Group of STS-1 of the Main OLIUs.
............................................................................................................................................................................
Step 8
Click
Send
to issue the command.
Result:
The Response Window should display the command
followed by a
COMPLD
indication.
Requirement:
The DS-1 test set should indicate it is receiving an
error free QRSS signal with B8ZS formatting.
If an error free signal is not received:
•
Verify that the DS-1 line coding format is set to B8ZS using the
rtrv-t1
command
•
Verify that the LBOs are set according to cable length using the
rtrv-t1
command (see Setting DS1, and DS3/EC1 LBOs (page
•
Check DS-1 cabling for proper connections.
............................................................................................................................................................................
Step 9
Use the scroll bar in the
Command Builder
window to scroll down to
the
dlt-crs-vt1
command.
............................................................................................................................................................................
Step 10
Click on the
dlt-crs-vt1
command.
............................................................................................................................................................................
Step 11
Under the
Parameters
section,
<VT1AIDCRSSRC>
, click on
m-1-{1}-
{1}-{1}
.
............................................................................................................................................................................
Step 12
Under the
Parameters
section,
<VT1AIDCRSDST>
, click on
{a}-{1}-
{1}-{1}
.