Installation Tests
LED Test
...........................................................................................................................................................................................................................................................
4 - 3 5
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................................................................................................
LED Test
Description
This test verifies proper operation of all LEDs on the Metropolis
®
DMXtend circuit packs. Operation of all the LEDs is necessary to assist
in trouble isolation.
Important!
If there are any LED failures, determine if the
problem is with the circuit pack or shelf and replace the faulty unit.
Important!
If the shelf is not fully equipped, move circuit packs
around and repeat the test for all valid circuit pack positions.
............................................................................................................................................................................
Procedure
Step 1
Use the scroll bar in the
Command Builder
window to scroll down to
the
test-led
command.
............................................................................................................................................................................
Step 2
Click on the
test-led
command.
The
test-led:lt-dmxtend:all:ctag::1;
command should be displayed in
the command window to the left of the
Send
button.
............................................................................................................................................................................
Step 3
Click
Send
to issue the command.
Result:
The
Response Window
should display the command
followed by a
COMPLD
indication.
Result:
All LEDs on the shelf should light for 10 seconds, then
extinguish for 10 seconds, and then the proper LEDs will light to
indicate the current status of the shelf.
............................................................................................................................................................................
Step 4
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps