Ring Setup and Testing: Integration Procedures
Automatic Protection Switching Test
6 - 1 2
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 5
Disconnect the optical fiber connected to the
IN
port of the OLIU that
is the active receiver.
Result:
The
NE
and then
MN
alarm LED should light on the
SYSCTL and the
FAULT
LED should flash on the OLIU.
............................................................................................................................................................................
Step 6
Click
Send
to issue a second
rtrv-state-path
command.
Result:
The Response Window should display the command
followed by a
COMPLD
indication as well as indicating that the ring
that was active in the previous step is now in signal-failure and the
other ring is now active.
............................................................................................................................................................................
Step 7
Reconnect the optical fiber to the OLIU.
Result:
After a short time, the
MJ
alarm LED on the SYSCTL and
the
FAULT
LED on the OLIU should extinguish.
............................................................................................................................................................................
Step 8
Repeat Step 3 through Step 7 to verify a switch back to the OLIU that
was originally active.
............................................................................................................................................................................
Step 9
Check off the appropriate box in Appendix E, Installation Checklist.
...........................................................................................................................................................................
End of Steps