363-205-401
Power Up: DLP-525
Issue 7, March 1997
Page 3 of 6
10. Place all twelve batteries in the battery compartment as shown in Figure 1.
Figure 1 – Layout of Lineage 2000 VR Series Batteries in 80E Cabinet
11. Coat inter-battery bus bars with NO-OXid grease and install on the batteries as
shown in Figure 2. Install 1/4 inch lock washer and nut on battery post. Using
insulated torque wrench with the socket, tighten nut to 55 in-lbs torque. Repeat
for each battery post until all 12 batteries are connected together.
1
12
11
10
9
8
7
6
5
4
3
2
1
12
11
10
9
8
7
6
5
4
3
2
1
12 11 10
9
8
7
6
5
4
3
2
1
12 11 10
9
8
7
6
5
4
3
2
1
12
11
10
9
8
7
6
5
4
3
2
1
12
11
10
9
8
7
6
5
4
3
2
FRONT VIEW
REF
31.25"
+
-
STRING #3
TOP VIEW
STRING #4
SIDE 2
84" REF
94" REF
+
-
-+
STRING #2
-+
STRING #1
BATTERY STRING CABLE
SIDE 1
-+
INTERBATTERY
-+
-+
-+ -+
-+
-+ -+ -+ -+
-+ -+
-+
-+
-+
-+ -+
-+
BUS BAR
-+ -+
-+
-+
-+
-+
+
-+