363-205-401
Power Up:
Issue 7, March 1997
Page 1 of 4
DLP-526
Verify Connections to ED-83114-30 Control &
Distribution Panel
SUMMARY: Verify AC power is off. Verify power and ground cables are connected.
Verify connections on AYK1 and AYK2 circuit packs. Verify rectifier control cable
connections to control & distribution panel. Verify battery installation.
1.
On AC power panel, verify that AC power (utility) CB1 circuit breaker is off and
CB6 (R1), CB7 (R2), and CB8 (R3), circuit breakers (for AC feeders to rectifier
shelf) are also off [Figure 1].
Figure 1 – AC Power Panel in ED-7C703-30 80E Cabinet
(J7,8)
(J5,6)
CB1
(UTILITY)
CB2
(GENERATOR)
CB7
(R2)
40
40
20
OFF
20
OFF
OFF
OFF
20
OFF
20
OFF
60
60
OFF
CB6
(R1)
OFF
20
OFF
20
OFF
CB3
CB8
(R3)
CB4
20
OFF
20
OFF
CB9
(J1,2,3,4)
20
OFF
(J9,10)
J3
J1
20
OFF
J5
J7
CB5
J9
COMPARTMENT)
CABLES (TO BATTERY
BATTERY HEATER
OUTLETS
AC
J10
R3
J13
J2
J4
J11
R1
J6
R2
J12
J8
SHELF
TO RECTIFIER