363-205-401
RT Turn Up: IXL-001
Issue 7, March 1997
Page 3 of 4
FIND YOUR JOB IN THE LIST BELOW
.
.
.
.
.
THEN GO TO
Block diagrams of the various feature package arrangements avail-
able for the
SLC Series 5 Carrier System are shown in Figure 1.
Figure 1 – Feature Package Arrangements
FPB with MC97771A1 BCU, FPC, or FPC-AutoCut
COT and RT Configuration (See Above)
with J1C182AE RT Channel Bank
900A1
DISTANT
TERMINAL
-2000 MSDT Feature)
FPB or FPC with AUB27 RT ADU (see above) COT and RT
configuration with J1C182AE RT Channel Bank. Requires
MC977791A1 BCU, AUB27 ADU, and AUA105 TRU units at the RT
J1C182AB/AE/AF
J1C182AA/AD
FPD requires the J1C182AD and J1C182AE Channel Banks
equipped with AUA71 TCUs.
RT
BCU
J1C182AB/AE/AF
FPC-AutoCut
(AUB27 RT ADU)
COT
MC97771A1
FPC/AC
FIBER-TO-THE-HOME
J1C182AA/AD
MC97755A1
SLC SERIES 5
SLC SERIES 5
FPF
(
SLC
MSDT
SLC -2000
RT
BCU
RT
FPD (FEATURE PACKAGE D)
or
FPC (FEATURE PACKAGE C)
MC97756A1
FPB (FEATURE PACKAGE B)
(AUB24 RT ADU)
or Mode 1
(DIGITAL CARRIER LINE UNIT)
RT
MC97724A1
BCU
(DIGITAL CARRIER LINE UNIT)
RT
BCU
J1C182AB/AE/AF
J1C182AB/AE/AF
MC97771A1
RT
BCU
J1C182AB/AE/AF
FPB with Special Service
(AUB27 RT ADU)
MC97771A1
BCU
MC97755A1
BCU
or Mode 1 or Mode 2
FPB/U/M1
FPB/I/M1
FPB/U/M1
FPB/I/M1
FPB/U/M2
FPB/I/M2
FPB/SS/U/M1
FPB/SS/I/M1
FPB/SS/U/M2
FPB/SS/I/M2
or Mode 1 or Mode 2
5ESS SWITCH/DCLU
(DIGITAL CARRIER LINE UNIT)
BCU
J1C182AA/AD
J1C182AB/AE/AF
BCU
SLC SERIES 5
SLC SERIES 5
SLC SERIES 5
SLC SERIES 5
SLC SERIES 5
SLC 96 Mode 1 or Mode 2 COT
SLC 96 Mode 1 or Mode 2 COT
SLC 96 Mode 1 COT
5ESS
5ESS SWITCH/DCLU
SWITCH/DCLU
COT
RT
MC97723A1
MC97722A1
FPA (FEATURE PACKAGE A)
SLC SERIES 5
SLC SERIES 5
FP303R3
5ESS Switch/IDCU
GTD 5EAX
DMS-100
MC97796A1
BCU
AUA112B
TRU
SLC Series 5
RT
J1C182AB/AE/AF
R
R
R