RT Turn Up: NTP-003
363-205-401
Page 4 of 8
Issue 7, March 1997
DO ITEMS BELOW IN ORDER LISTED
FOR DETAILS, GO TO
10.
NOTE:
The choice ADU, BCU, TRU, and LIU determines the
Feature Package configuration of the RT system.
Install ADU (alarm display unit) optioned for
pre-service and
unequipped, install BCU, and then change the ADU options to
pre-service and equipped:
A. AUB21 ADU [Feature Package A (FPA) using MC97723A1
or MC97756A1 BCU).
B. AUB24 ADU (FPB Mode 1 using MC97724A1,
MC97771A1, or MC97776A1 BCU. FPB Mode 2 with
MC97771A1 or MC97776A1 BCU. No special service).
C. AUB27 ADU [FPB Mode 1 or Mode 2 with special service,
and FPC-Autocut using MC97771A1 or MC97776A1 BCU.
Feature Package F FPF (ADU optioned as FPC) using
MC97779A1 BCU.]
D. AUB26 ADU [FPC or Feature Package D (FPD) using
MC97756A1 BCU.]
11. Install and test PCU in AB shelf.
12. Install TRU (transmit/receive unit) in AB shelf.
13. For FPD only, install TCU (transcoder unit) in LIU-B slot in facility
shelf.
14.
NOTE:
All LIUs in the same system should have identical option
switch settings.
Install DS1 LIU (line interface unit) in LIU-A slot in facility shelf
after making option, equalizer, and transmit pad settings.