363-205-401
RT Turn Up: NTP-003
Issue 7, March 1997
Page 5 of 8
DO ITEMS BELOW IN ORDER LISTED
FOR DETAILS, GO TO
15.
NOTE:
All LIUs in the same system should have identical option
switch settings.
NOTE:
FPB Mode 2 does not require an LIU in LIU-B slot. FPD
requires a TCU in LIU-B slot.
Install DS1 LIU in LIU-B slot in facility shelf after making option,
equalizer, and transmit pad settings for FPA, FPB Mode 1, FPC,
or FPC-AutoCut, or FPF.
16. If equipping shelves CD in the dual bank assembly, continue with
Step 17. Otherwise, proceed to Step 23.
17. Install (if not previously installed) 3-type protectors in protector
panel for shelf group(s) being equipped.
18. Install PCU in CD shelf.
19. Install TRU in CD shelf.
20. For FPD only, install TCU (transcoder unit) in LIU-D slot in facility
shelf.
21.
NOTE:
All LIUs in the same system should have identical option
switch settings.
Install DS1 LIU in LIU-C slot in facility shelf after making option,
equalizer, and transmit pad settings.