363-205-401
DT Turn Up:
Issue 7, March 1997
Page 1 of 2
DLP-503
Install ASJ1 or ASJ2 Channel Unit in 900A1, 900A2,
or 900A3 DT Closure
1.
Get one ASJ1 or ASJ2 Channel Unit and inspect for physical damage.
2.
Align the holes on the side of the CU board with the stand off pins located on
inside of 900A1, 900A2, or 900A3 DT closure door (Figure 1) and slide the CU
board onto the pins.
3.
Secure the PCU and CU boards on the stand off pins by inserting cotter pins
into the holes in the ends of the pins.
4.
Check that DT power is turned off.
5.
Insert connector J103/J107 into connector P103 located at the rear of the CU.
STOP. YOU HAVE COMPLETED THIS PROCEDURE.