363-205-401
Conversions: DLP-506
Issue 7, March 1997
Page 5 of 6
14. After approximately 20 seconds, do ADU and BCU FAIL indicators go off?
If YES, then proceed to Step 21.
If NO, then continue with Step 15.
15. Replace BCU with BCU removed previously.
16. Remove ADU and check settings of switches on option switch S1 per work
order and Steps 2 - 8.
17. Are switch settings on option switch correct?
If YES, then continue with Step 18.
If NO, then proceed to Step 20.
18. Get another ADU and set switches on option switch S1 according to work
order and Steps 2 - 8.
19.
!
CAUTION:
Incorrectly set ADU option switches may result in immediate or future
loss of service or may introduce errors into the digital bitstream.
Insert ADU into ADU slot in bank being equipped. Proceed to Step 21.
Response:
After approximately 20 seconds, ADU and BCU FAIL indica-
tors go off.
20. Correct setting of switches on option switch and repeat from Step 11.
21. Wait 10 minutes before doing this Step when converting to an FPC-AutoCut
configuration. Wait until the PRV goes off for a Mode 1 or Mode 2 conversion.
Remove ADU and set CLEAR/NORM option plug for NORM.
22. Reinstall ADU.